Suction pile installation and removal on Seagreen windfarm

Year: 2019 (Feb to May)
Location: UK
Activity: Transport and Installation

Scope

Design engineering and fabrication of a trial suction pile for the Seagreen windfarm project. In addition Marine Masters was responsible for the trail testing operations which included installation and subsequential removal of the suction pile in the Seagreen field.