OPHIR platform decommissioning & relocation

Year:                   2019 (March to Sept)

Location:            Malaysia

Project scope:          

World’s first decommissioning and straight relocation of Ophir wellhead platform in One Piece. For this 1500Mt suction pile based jacket a special lifting method was developed which enabled the lifting of the jacket & topside as one lift by means of the 5000Mt HLV “Asian Hercules III”. The platform was removed, transported in the hooks and re-installed within record breaking time of 3 days.