OPHIR platform decommissioning & relocation
Year: 2019 (March to Sept)
Location: Malaysia |
Project scope:
World’s first decommissioning and straight relocation of Ophir wellhead platform in One Piece. For this 1500Mt suction pile based jacket a special lifting method was developed which enabled the lifting of the jacket & topside as one lift by means of the 5000Mt HLV “Asian Hercules III”. The platform was removed, transported in the hooks and re-installed within record breaking time of 3 days.